« Disgruntled Christmas greetings... | Main | Bathroom framing »
December 14, 2005
Drywall & doorways
I managed, yesterday, to finish insulating the mud room, add the last bit of vapour barrier, and get the rest of the drywall hung in the laundry room and mud room. Nothing's even close to square, which made things a bit difficult, but at least it's covered. I'll spend a half hour or so tomorrow to add some more screws (as the ones I had weren't long enough). It's amazing what a difference it makes--both rooms are much, much brighter, which shows just how much light the horrible hardboard panelling was absorbing.
I also added 1"x8" around the doorway between the mud room and the rest of the house, as I had visions of one of us catching our feet (or something else) on the exposed edges of the drywall. Now it's on to flooring, which Dana & I should hopefully get installed Friday, so long as I manage to get all of the necessary supplies this morning.
Posted by plainstext at December 14, 2005 08:45 PM
Trackback Pings
TrackBack URL for this entry:
http://www.plainstext.com/movabletype/mt-tb.cgi/24