« Missing light shades | Main | Sunrise over Aberdeen »
December 06, 2005
Weekend Busy-ness
We managed to get a lot done this weekend, including removing the last of the plaster (and plaster keys) from the laundry room walls, installation of a new plug in the mud room, rewiring of the mud room switches and light fixture, and the installation of a new exterior door for the mud room.
It was a good thing that both Trent and William were there, as we discovered that the mud room's exterior door was suspended from the roof, with nothing running through to the foundation for support. This was the same thing that we'd encountered with the mud room, itself. But, we'd hoped that the previous exterior door had been properly installed. Not so.
Between them, William & Trent constructed a much more solid and properly engineered ;-) door frame. The actual installation of the door took a great deal less time. There's now a great deal of light in the mud room, which was previously rather dark, and you can no longer see the outside world through large gaps in the door (never mind the piece of MDF that had been nailed to the bottom of the door in order to keep out the vermin).
Mud Room Before
Mud Room After
Posted by plainstext at December 6, 2005 08:44 PM
Trackback Pings
TrackBack URL for this entry:
http://www.plainstext.com/movabletype/mt-tb.cgi/15